RFP #2221

East River Plaza Striping

Properties

...

East River Plaza

Class

Commercial

Category

Mixed

Address

517 E 117th St, New York, New York 10035

RFP Scope

Jun 26, 2026 at 7:24 PM | Last updated

Description


Contractor shall provide all labor, material, equipment, supervision, layout, and coordination required to complete garage striping and related pavement markings/signage at East River Plaza.

The attached drawings are provided for reference and show the intended parking stall lines, traffic arrows, handicap markings/signage, taxi lane markings/signage, directional markings, and related garage striping requirements. Contractor is responsible for visiting the site, verifying all field conditions, confirming existing conditions against the drawings, and identifying any additional striping, signage, or layout adjustments required to complete the work properly. There are 8 Floors total, 1,248 parking stalls total, **Please confirm if you have the machinery for tighter areas to work around cars that are parked**



Scope to include:

  1. Site Walk and Field Verification
  2. Contractor shall visit the property prior to pricing and/or starting work to verify all dimensions, existing striping, signage locations, traffic flow, obstructions, columns, ramps, curbs, pedestrian areas, handicap parking areas, taxi lane areas, and all other field conditions. Contractor shall notify ownership of any conflicts, missing information, or recommended changes before work begins.
  3. Pricing by Floor / Area
  4. Contractor shall provide pricing broken out by floor and/or garage level. Ownership will review pricing and advise whether the full garage will be completed or whether only certain floors, levels, or portions of the garage will be approved to proceed.
  5. Work Hours
  6. All work must be performed overnight between 9:00 PM and 6:00 AM, unless otherwise approved by ownership in writing. Contractor shall coordinate scheduling with property management in advance to minimize disruption to tenants, customers, garage operations, and traffic flow.
  7. Garage Striping
  8. Contractor shall layout and stripe parking stalls, drive lanes, arrows, directional markings, crosswalks, no-parking areas, access aisles, handicap spaces, taxi lane markings, and any other pavement markings shown on the attached drawings or identified during the field walk.
  9. Handicap Parking and Signage
  10. Contractor shall provide and/or repaint handicap symbols, access aisles, striping, and related signage as required by the drawings and applicable code. Final locations and quantities shall be confirmed in the field.
  11. Taxi Lane Signage and Markings
  12. Contractor shall provide striping and signage for taxi lane areas as shown on the drawings and as verified onsite.
  13. Surface Preparation
  14. Contractor shall clean and prepare all surfaces prior to striping. This shall include removal of loose debris, dust, dirt, grease, flaking paint, or any other material that may prevent proper adhesion. Any areas requiring additional preparation shall be brought to ownership’s attention before work proceeds.
  15. Materials
  16. Contractor shall use durable traffic-grade paint suitable for parking garage use. Paint colors, line widths, symbols, arrows, and signage shall match the drawings, existing garage standards, and applicable requirements unless otherwise directed by ownership.
  17. Access and Height Restriction
  18. The maximum garage clearance height is 9 feet. Contractor is responsible for providing equipment, vehicles, and lifts that can safely access the work areas within the garage height restriction.
  19. Traffic Control and Coordination
  20. Contractor shall coordinate work with property management to minimize disruption to tenants, visitors, garage operations, and traffic flow. Contractor shall provide cones, barricades, caution tape, temporary signage, and any other safety measures required to protect the public and the work area.
  21. Cleanup
  22. Contractor shall keep the work area clean and remove all debris, materials, tape, containers, and equipment upon completion. All areas shall be left clean and safe.
  23. Insurance / COI
  24. Contractor shall provide a valid Certificate of Insurance meeting ownership requirements prior to starting work. Attached COI requirements are provided for reference.
  25. Final Review
  26. Upon completion, contractor shall walk the work with ownership/property management and correct any deficiencies, missing markings, incomplete signage, or layout issues identified during the final inspection.

Contractor shall include all labor, material, equipment, layout, mobilization, field verification, surface preparation, traffic control, signage, cleanup, and final touch-ups required to complete the work in a professional and code-compliant manner.

Dealbreakers


Vendor requirements


Please review COI requirements, and Drawings. Confirm field conditions and any additional signage.


If you would like to schedule a site visit, please reach out to the following:


Yoneirys Valentin – Assistant Property Manager – Yvalentin@eastriverplaza.com

 

Besart Beqiri – Operations Manager Bbeqiri@eastriverplaza.com


Site Visits scheduled for 7/7/2026


Proposal Deadline 7/10/2026

Book a site visit

Instructions


Select a date

Select a time

Select a date to see available time slots

Posted by

BB

Besart Beqiri

Property Manager at Blumenfeld development group

Project overview

Work categories

Garage Building

Bidding deadline

Jul 9, 2026

Work dates

Jul 20, 2026 - Jun 26, 2026

Budget

No budget

Light RFP Fee
0% of the winning bid.

Need help?

David Barakchian

CEO at Light RFP

Call Email

About Light RFP

Procurement perfected.

Discover RFPs, attend site visits, ask RFIs, submit bids, and win new business with Light RFP's procurement platform.

Find the best projects for your business.

Receive invitations to RFPs or search through Light RFP's marketplace of live RFPs to bid on available projects in your area.

Only pay for contracts you've won, not leads.

0% of the winning bid is charged immediately upon contract signing. You pay nothing if your bid is not selected.

Centralize compliance requirements for quick bidding.

All COI, W9, insurance policies, and certifications are stored in the platform to keep your data organized, up to date, and ready to bid.

Request for information

Anonymous RFIs

Post a question here and it will appear anonymous to the public. The property manager will still be able to know who you are in order to best answer your question.

Ask an anonymous question

Looking for more projects?

Browse available RFPs on our marketplace.