Description


An active leak originating from the shower in the apartment above Unit 14 has caused ceiling damage in the bedroom below. Prior to ceiling repair and plumbing installation, a licensed general contractor must complete all demolition and structural preparation work in the shower area. This scope is Phase 1 of a two-phase remediation. The plumbing contractor (Phase 2) cannot begin until all items below are complete and inspected.


Scope of Work


1. Demolition

  • Demolish and fully remove the existing shower base and shower curb.
  • Remove wall finishes a minimum of 8 inches up on all shower walls to expose substrate.
  • Fully expose the existing shower drain piping for plumber access and inspection.


2. Structural Assessment & Subfloor Repair

  • Inspect the subfloor and plywood base beneath the shower floor for structural integrity.
  • If the subfloor is found to be damaged, deteriorated, or otherwise unsuitable, contractor is responsible for repairing or replacing it prior to plumber's arrival.
  • Provide written confirmation to property manager once subfloor is deemed structurally sound.


3. Site Preparation

  • Protect adjacent living areas from dust and debris during demolition.
  • Remove and dispose of all demolished materials off-site in compliance with NYC regulations.


4. Coordination & Re-Build Once Plumbing is Complete

  • Coordinate directly with the plumbing contractor (Superior Plumbing) to confirm readiness before their mobilization.
  • Be available for a joint site walk prior to plumber arrival if required.
  • Install new tile
  • Re-construct the shower curb
  • Close and finish all wall and floor openings



Deliverables

  • Completed demolition with all materials removed.
  • Written subfloor condition report (pass/fail + any repairs made).
  • Confirmation of readiness for plumbing contractor to proceed.
  • Re-build of tile and shower curb along with closing and finishing floors and wall openings

Dealbreakers


Experience with residential/mixed-use interior demolition in NYC

Vendor requirements



  • NYC Licensed General Contractor
  • $1M Commercial General Liability Insurance
  • $1M Workers' Compensation Insurance
  • Experience with residential/mixed-use interior demolition in NYC

Book a site visit

Instructions


Select a date

Select a time

Select a date to see available time slots

Posted by

...

Brian Kay

Property and Construction Manager at Choice new york

Project overview

Work categories

General Contractors

Bidding deadline

Apr 4, 2026

Work dates

Apr 6, 2026 - Apr 10, 2026

Budget

No budget

Light RFP Fee
2% of the winning bid.

Need help?

Darryl A.

Senior SDR at Light RFP

Call Email

About Light RFP

Procurement perfected.

Discover RFPs, attend site visits, ask RFIs, submit bids, and win new business with Light RFP's procurement platform.

Find the best projects for your business.

Receive invitations to RFPs or search through Light RFP's marketplace of live RFPs to bid on available projects in your area.

Only pay for contracts you've won, not leads.

2% of the winning bid is charged immediately upon contract signing. You pay nothing if your bid is not selected.

Centralize compliance requirements for quick bidding.

All COI, W9, insurance policies, and certifications are stored in the platform to keep your data organized, up to date, and ready to bid.

Request for information

Anonymous RFIs

Post a question here and it will appear anonymous to the public. The property manager will still be able to know who you are in order to best answer your question.

Ask an anonymous question

Looking for more projects?

Browse available RFPs on our marketplace.